Skip to content
Srinibas Pradhan Constructions IPO

Srinibas Pradhan Constructions IPO: Dates, Price Band & Lot Size Details

Srinibas Pradhan Constructions IPO Overview

Srinibas Pradhan Constructions IPO

Srinibas Pradhan Constructions Limited is launching its SME IPO with a book building issue aimed at raising approximately ₹20.32 crore. The IPO is priced in the band of ₹91 to ₹98 per equity share, with each share having a face value of ₹10. The issue comprises both fresh shares and an offer-for-sale portion, and is set to be listed on the NSE SME platform.

IPO Important Dates

Event Date
IPO Open Date 06 Mar 2026
IPO Close Date 10 Mar 2026
Basis of Allotment 11 Mar 2026
Refunds 12 Mar 2026
Credit to Demat 12 Mar 2026
Listing Date 13 Mar 2026

The subscription window for the issue opens on 6th March 2026 and closes on 10th March 2026, with tentative listing scheduled for 13th March 2026 on NSE SME.

Srinibas Pradhan Constructions IPO

Issue Price & Size

Attribute Details
Price Band ₹91 – ₹98 per share
Face Value ₹10 per share
Total Issue Size 20,73,600 shares (₹20.32 Cr)
Fresh Shares 17,13,600 shares
Offer for Sale 3,60,000 shares
Listing Exchange NSE SME

The company’s IPO will include a mix of fresh issue shares and an offer for sale contributing to the total issue size.

Srinibas Pradhan Constructions IPO

Market Lot & Investment Amount

Application Lots Shares Amount (₹)
Retail (Min) 2 2,400 2,35,200
Retail (Max) 2 2,400 2,35,200
S-HNI (Min) 3 3,600 3,52,800
S-HNI (Max) 8 9,600 9,40,800
B-HNI (Min) 9 10,800 10,58,400

Investors can bid in minimum lots of 2,400 shares, and bids must be in multiples of 1,200 shares beyond the minimum requirement.

IPO Reservation Details

Investor Category Shares Offered % of Issue
QIB (Ex. Anchor) 19,200 0.93%
NII (HNI) 9,75,600 47.05%
Retail Investors 9,74,400 46.99%

The issue is allocated across different investor categories with nearly equal proportions for non-institutional and retail investors.

Company & Business Summary

Srinibas Pradhan Constructions Limited, incorporated in 2020, operates in the infrastructure and utilities sector. The company undertakes a range of civil and industrial construction projects including roads, highways, bridges, electricity infrastructure, and mining infrastructure. Its business model revolves around securing and executing contracts through competitive bidding, especially within the state of Odisha.

Allotment & Listing Timeline

Once bidding closes on 10th March 2026, the basis of allotment is expected to be finalized on 11th March 2026. Refunds will be processed and shares credited to investors’ demat accounts by 12th March 2026, with the IPO set to debut on the exchange on 13th March 2026.

Back To Top